BAHTERA LINTAS SAMUDERA

Heavy-Lift Indonesia

Project List

  1. Principal YAYASAN PURNA BHAKTI PERTIWI
    Name of Project LAND TRANSPORTATION OF KRI “HARIMAU” FROM ON WATERS TG.PRIOK PORT ONTO FOUNDATION AT TAMAN MINI INDONESIA INDAH
    Material 1 COMPLETE BATTLESHIP
    High Point LAND TRANSPORT OF A 20M LONG; 5.50M HIGH SHIP HULL
    Execution 1990
  2. Principal PERUM LISTRIK NEGARA (PLN)
    Name of Project SCATTERED DIESELS
    Material 11 SETS G.E.C. DIESEL ENGINES FOR POWER STATIONS IN SENAYAN, KETAPANG & SUNGAI PENUH
    High Point REMOTE UNFRIENDLY SITES
    Execution 1990 through 1991
  3. Principal HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD., SEOUL
    Name of Project SEMEN CIBINONG EXTENSION PHASE III
    Material CEMENT PLANT EQUIPMENT & MACHINERY
    High Point SPECIFIC TRANSPORTS LOGISTICS SYSTEM, KILN WEIGHING 160T
    Execution 1990 through 1991
  4. Principal PT. CITRA AMBENGAN INTERNATIONAL, JAKARTA
    Name of Project TWO PIECES ALUMINIUM CAN INDUSTRY
    Material MACHINERY FOR ALUMINIUM CAN PRODUCTION
    High Point SPECIFIC TRANSPORTS LOGISTICS SYSTEM. DOOR TO DOOR
    Execution 1990
  5. Principal PT. ONWARD PAPER UTAMA, JAKARTA
    Name of Project SCOTT TISSUE PAPER MANUFACTURE
    Material MANUFACTURING MACHINES & EQUIPMENT
    High Point YANKEE DRIER OF 120 T
    Execution 1990
  6. Principal HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD., SEOUL
    Name of Project COAL TERMINAL CONSTRUCTION IN EAST KALIMANTAN
    Material CONSTRUCTION EQUIPMENT
    High Point SPECIFIC TRANSPORTS LOGISTICS SYSTEM. REMOTE AREA UNFRIENDLY ENVIRONMENT, HEAVY PIECES UP TO 100T
    Execution 1990 through 1991
  7. Principal PERUM LISTRIK NEGARA (PLN)
    Name of Project RELOCATION GAS TURBINE POWER STATION FROM UJUNG PANDANG TO TARAHAN
    Material 1 COMPLETE SET ALSTHOM GAS TURBINE
    High Point GAS TURBINE WEIGHING 120T
    Execution 1991
  8. Principal PT. KOMPAS INDONESIA, JAKARTA
    Name of Project “INDONESIAN PRODUCT EXHIBITION 1991” IN SINGAPORE
    Material EXHIBITION GOODS
    High Point PRECISION TRANSPORTS LOGISTICS SYSTEM
    Execution 1991
  9. Principal PT. INTI KARYA PERSADA TEHNIK, JAKARTA
    Name of Project PETROKIMIA GRESIK
    Material AMMONIA & UREA PLANT EQUIPMENT
    High Point PRECISION TRANSPORTS LOGISTICS SYSTEM
    Execution 1991
  10. Principal PT. PAL, SURABAYA / PT. HANDFAST FORWARDING
    Name of Project 30.000 T SHIPYARD FACILITY
    Material GENTRY CRANE FROM GOTTWALD
    High Point 1 HEAVY PIECE OF 120 T
    Execution 1991
  11. Principal PT. PAL, SURABAYA / PT. HANDFAST FORWARDING
    Name of Project HYDRODINAMIC LABORATORY SUKOLILO
    Material LABORATORY EQUIPMENT
    High Point LANDTRANSPORT OF HEAVY & OVER SIZE PIECES
    Execution 1991
  12. Principal PT. SEMEN GRESIK (PERSERO), GRESIK
    Name of Project CEMENT TUBAN
    Material COMPLETE SET EQUIPMENT & MACHINERY FOR NEW CEMENT PLANT IN TUBAN
    High Point PRECISION TRANSPORTS LOGISTICS SYSTEM
    Execution 1992 through 1993
  13. Principal DAVY BRITISH RAILWAY INTERNATIONAL, LONDON
    Name of Project CIGADING – SERPONG RAILWAY REHABILITATION
    Material RAILWAY EQUIPMENTS
    High Point PRECISION TRANSPORTS LOGISTICS SYSTEM
    Execution 1992 through 1993
  14. Principal PT. KAWASAN INDUSTRI JABABEKA, CIKARANG
    Name of Project PRIVATE DIESEL POWER STATION
    Material 11 UNITS DIESEL ENGINES
    High Point HEAVY PIECES OF 55 T
    Execution 1992
  15. Principal HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD., SEOUL
    Name of Project PAITON STEAM POWER STATION ELECTRICAL LOT FC-07
    Material ELECTRICAL & MECHANICAL EQUIPMENTS
    High Point SPECIFIC TRANSPORT & CUSTOMS CLEARING LOGISTICS SYSTEM
    Execution 1992 through 1993
  16. Principal HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD., SEOUL
    Name of Project PAITON STEAM POWER STATION ELECTRICAL LOT FC-07
    Material ELECTRICAL & MECHANICAL EQUIPMENTS
    High Point SPECIFIC TRANSPORT & CUSTOMS CLEARING LOGISTICS SYSTEM
    Execution 1992 through 1993
  17. Principal PERTAMINA – ATLANTIC RICHFIELD INDONESIA INC.
    Name of Project OFF-SHORE NORTH WEST JAVA GAS DEVELOPMENT PROJECT BEACH PIPELINE APPROACH AND CABLE CROSSING
    Material DIRECTIONAL DRILLING UNIT C/W ACCESSORIES
    High Point SPECIFIC TRANSPORTS LOGISTIC SYSTEM
    Execution 1992 through 1993
  18. Principal PT. FOOD SPECIALTIES INDONESIA (NESTLE), JAKARTA
    Name of Project PT. NESTLE ASEAN INDONESIA NEW PRODUCTION UNIT IN KEJAYAN, EAST JAVA
    Material COMPLETE SET OF MANUFACTURING EQUIPMENTS
    High Point PRECISION TRANSPORTS LOGISTICS SYSTEM
    Execution 1992 through 1993
  19. Principal PT. BOMA BISMA INDRA, PASURUAN
    Name of Project PAITON STEAM POWER PLANT STATION
    Material 4 UNITS HAMON SOBELCO CONDENSORS EACH WEIGHING 120 T; 24 M LONG
    High Point HIGH PRECISION TRANSPORTATION TOOLS & METHOD TO AVOID FLEXIONS
    Execution 1993
  20. Principal PT. BOMA BISMA INDRA, PASURUAN
    Name of Project PAITON STEAM POWER PLANT PROJECT
    Material 2 UNITS CONDENSOR TUBE BUNDLES FROM PASURUAN TO PLN’S OMBILIN SITE HEAVY EQUIPMENT IMPORT WITH 230B F ACILITY, SINGAPOREPROBOLINGGO-PASURUAN-PAITON
    High Point HIGH PRECISION TRANSPORTATION TOOLS & METHOD TO AVOID FLEXIONS
    Execution 1993
  21. Principal PT. SEMEN TUBAN, TUBAN
    Name of Project ABB SUPPLY PACKET F FOR CEMENT TUBAN PROJECT
    Material SPARE PARTS FROM SWEDEN, TURKEY, GERMANY
    High Point HIGH LOGISTICS
    Execution 1993 through 1994
  22. Principal PT. SEMEN CIBINONG, CIBINONG
    Name of Project RE-EXPORT & RE-IMPORT FOR REFURBISHMENT FROM PT. SEMEN CIBINONG TO FULLER / USA
    Material 1 ROLLER + 1 BEARING TOTAL 38
    Execution 1993 through 1994
  23. Principal PT. NESTLE ASEAN INDONESIA, JAKARTA
    Name of Project ERECTION MACHINERY FOR KEJAYAN PROJECT, PASURUAN
    Material GENSET & BOILER
    High Point SLIDING EXTRA LONG CONDENSER INTO COMPLETED BUILDING
    Execution 1993
  24. Principal DAVY BRITISH RAILWAY INTERNATIONAL, JAKARTA
    Name of Project CIGADING-SERPONG RAIL WAY INTERNATIONAL PROJECT
    Material SIGNALLING EQUIPMENTS
    High Point PRECISION TRANSPORTS LOGISTICS SYSTEM
    Execution 1993
  25. Principal TASAN MEGAH JOINT OPERATION, CILEGON
    Name of Project GUNUNG DRAJAT GEOTHERMAL POWER PLANT PROJECT
    Material COOLING TOWER & EQUIPMENTS
    High Point DIFFICULT MOUNTAIN ROAD ACCESS
    Execution 1994
  26. Principal WSI CONSORTIUM, JAKARTA (WESTINGHOUSE, SAMSUNG, ITOCHU)
    Name of Project BALI GAS TURBINE POWER PLANT PROJECT
    Material POWER PLANT EQUIPMENTS HEAVY JETTY REINFORCEMENT TO ACCOMODATE ON DISCHARGING OF TURBINES
    Execution 1993 through 1994
  27. Principal PT. INTI KARYA PERSADA TEHNIK, JAKARTA
    Name of Project ARUN MOBILE OIL, SURABAYA – LHOKSEUMAWE
    Material 36 UNITS BOOSTER
    Execution 1994
  28. Principal GEC-ALSTHOM STAFFORD – U.K.
    Name of Project OMBILIN STEAM POWER PLANT
    Material ALL IMPORT CARGO AND LOCAL FABRICATION (45.000FT)
    Execution 1994 THROUGH 1996
  29. Principal I K P T
    Name of Project TRAIN G BONTANG
    Material TRANSPORTATION LOCAL FABRICATOR EX SURABAYA & BATAM TO BONTANG (15.000 FT)
    Execution 1996
  30. Principal THYSSEN HANIEL LOGISTIC SINGAPORE
    Name of Project BILFINGER + BERGER MEKAR PUTIH SOUTH KALIMANTAN
    Material PULAU LAUT BACK LOADING FACILITIES (5.000 FT)
    Execution 1996 through 1997
  31. Principal THYSSEN HANIEL LOGISTIC SINGAPORE
    Name of Project INCO EXPENSION PROJECT MALILI (150.000 ft)
    Material HANDLING IN MALILI, SURABAYA, JAKARTA.
    Execution 1996 through 1998
  32. Principal BOMA BISMA INDRA PASURUAN
    Name of Project GUNUNG SALAK GEOTHERMAL POWER PLANT (FLUOR DANIEL / IKPT)
    Material INLAND TRANSPORT 10 DEREATOR BBI PASURUAN TO GN. SALAK SITE
    Execution 1996
  33. Principal BALCKEDURR INDONESIAName of Project MUARA TAWAR STEAM POWER STATION
    Material 7 UNIT OVERSIZE CARGO EX. PUSPETINDO GRESIK
    Execution 1996
  34. Principal AGUMAR
    Name of Project METAEPSI TRANSMITION PROJECT
    Material 5 UNIT TRANSFORMER 110 TON & ACCESS FOR JAKARTA
    Execution 1996
  35. Principal BILFINGER + BERGER
    Name of Project JAKARTA OUTER RING ROAD
    Material PRESS STRESS BEAM
    Execution 1997 – 1999
  36. Principal MAXUS / KWARTADAYA DIRGA NUSA
    Name of Project MAXUS POWER PLANT
    Material 2 UNIT COMPLETE SET TURBINE + GENERATOR & ACCESSORIES, FOR “SEA FOX” JACK-UP RIG
    Execution 2000 – 2001
  37. Principal LEKOM MARAS
    Name of Project EXPORT FISHING TOOLS TO THAILAND
    Material COMPLETE SET OF FISHING TOOLS
    Execution 2002
  38. Principal INDONESIA POWER
    Name of Project COAL SUPPLY & TRANSPORTATION FOR PLTGU SURALAYA
    Material 90.000 Mt of Coal
    Execution 2002 – 2003
  39. Principal PERTAMINA – BALCKE DURR INDONESIA
    Name of Project PERTAMINA BALIKPAPAN REFINERY
    Material 2 UNIT BENFIELD SOLUTION STRIPPER (75 TONS WEIGHT, 50 LENGTH)
    Execution 2003
  40. Principal PT. INDONESIA POWER
    Name of Project COMBINE CYCLE POWER PLANT (CCPP) PROJECT PEMARON, BALI
    Material COMPLETE SET MATERIAL & EQUIPMENT (6600 FT)
    Execution June 2003 – May 2004
  41. Principal PT. PLN (PERSERO) PIKITRING KALIMANTAN
    Name of Project TARAKAN POWER STATION
    Material 2 UNIT COMPLETE SET DIESEL & GENERATOR
    Execution August – October 2003
  42. Principal PT. TRIPATRA ENGINEERING – CONOCO PHILLIPS
    Name of Project SOUTH JAMBI “B” SHALLOW GAS PROJECT
    Material 2 UNITS COMPLETE SET GAS COMPRESSOR
    Execution JANUARY – MARCH 2004
  43. Principal PT. TRIPATRA ENGINEERING – CONOCO PHILLIPS
    Name of Project SOUTH JAMBI “B” SHALLOW GAS PROJECT
    Material 2 UNITS COMPLETE SET GAS COMPRESSOR
    Execution NOVEMBER 2003 – MARCH 2004
  44. Principal PT.CHIYODA INTERNATIONAL – PT.SEMPEC INDONESIA
    Name of Project BETARA COMPLEX DEVELOPMENT (BCD)
    Material 1 X 180FT- AIR COLLER AND HEAT EXCHANGER
    Execution MAY 2004
  45. Principal PT.HICKHAM INDONESIA – SULZER
    Name of Project PAITON POWER PLANT PHASE 3
    Material 2 UNITS CYLINDERS PUMP
    Execution MAY 2004
  46. Principal IKPT/CHIYODA
    Name of Project BETHARA COMPLEX DEVELOPMENT (BCD PROJECTS)
    Material INLAND TRANSPORT & SEA TRANSPORT ALL MATERIAL & EQUIPMENT EX. LOCAL FABRICATION
    Execution JUNE 2004 – NOVEMBER 2004
  47. Principal ABB
    Name of Project ANTAM Pomala
    Scope:
    - Transportation 1 unit transformer 80 Ton from Italy to Pomala
    - Replace old transformer at 7 meter height with new one
    Execution 2006
  48. Principal Texmaco
    Scope : Relocation Tanjung Priok to Marunda Shore Base: 9 units Steel Mills Equipme t 120 Ton to 240 Ton
    Execution 2006
  49. Principal PT Cikarang Listindo
    Scope : Transportation and handling of 1 unit Turbine – 220 Ton + 1 unit Generator 160 Ton from Tg Priok to Cikarang via Citarum River
    Execution 2007
[A] Aste School [B] Bangjo Tours [I] Indonesia Country [J] Java Trendy JavaTrade [M] Monkasel [R] Renovasi Bangunan